ofuro for Cape Town -2- start work

Continues from a previous post. Open the blog about “choosing the lumber” in a separate window.

We have been contacted by a private client in South Africa about 3 years ago.
He was going to build a new house overlooking the sea and wanted a japanese bathtub.
Apparently it took more than expected for the permits and to start construction but he got back to us and placed the order. We have a comfortable time frame but since we will ship by ocean freight we started construction:
IMG_0054
First the planks are planed

IMG_0057
Then the material to compose the side walls is selected also considering the grain direction (both to avoid warping and for the aesthetic balance)

IMG_0060
Then thru-holes are opened in the sections of the planks

IMG_0061
and the different parts are composed together with the aid of wood dowels and waterproof glue (only on the matching sections)

IMG_0063
The laminated side walls are pressed and left to rest for few days to dry and stabilize

<will continue…>