lead time and bubbles
Hello, I am designing a showroom for *** that opens 8/11, but
would need to have the tub here in New York by mid-July. What is you
lead time? We are creating a Spa lifestyle and need to simulate it like
it actually works. We will put water in it and need it to bubble. Please
let me know as soon as possible.
Thank you for your interest in our japanese bathtubs!
We need about 3 weeks for production and 1wk for shipping with ocean
freight so the timeframe is very tight.
Please let me know the sizes you are looking at and we will provide a
quotation and drawing for your reference.
About the bubbles, we cannot supply equipment because of the difficulty
to provide assistance, spare parts etc.
We recommend to use spa equipment available in the US (Waterways,
Hayward, Jandy, Pentair, Certkin etc!)
Check with a spa equipment company what they recommend for a tub with 1
1/2″ thick bottom. Of course the wood thickness can be partially reduced
on the back if needed (with a trimmer, around the blower noozle socket)
We are looking forward to working with you and remain at you disposal
for any question/problem.